| S.no | Name of Completed Project | Duration | Cost |
| 1 | P. No. 41-B, Road from Kawademala to Dobadwadi is done in UTWT manner. | 5 Months | 1 Cr. |
| 2 | Road from Viman Nagar Oakwood to Skating Ground Bio-Driverity Zone Garden | 6 Months | 1 Cr. |
| 3 |
P. No. 3 A, To work for the Lohgaon Airport Skating Rink..
clubhouse & the internal bridge over the drain. |
6 Months | 0.4 Cr. |
| 4 | Concrete Road from Surakshanagar to Mhada Colony in P. No. 42B | 6 Months | 1 Cr. |
| 5 |
P. No. 1A, to do the remaining road work from Sai Chowk to ITI
Ground & to do the concretization & other works of the remaining road from Sai Chowk to Sutarwadi at P. No.1 |
4 Months | 1 Cr. |
| 6 | P. No. 24, Apte Road Concretization in TWT Overlay manner. | 4 Months | 1.3 Cr. |
| 7 | Concretize the remaining road in Mundhwa Tadiguta Chowk. | 4 Months | 1 Cr. |
| 8 |
To provide day-to-day maintenance work of all main asphalt &
concrete roads in the jurisdiction (Yerwada Regional Office & Nagar Road Regional Office & Dhankwadi Regional Office) of the Road Division with mobile maintenance & utility train driver & to carry out daily maintenance repair work. |
12 Months | 3 Cr |
| 9 | To undertake development work on the direction project at Ramtekadi Industrial Estate. | 4 Months | 1 Cr. |
| 10 | P. No. 46A, Strengthening roads under Ramtekadi. | 6 Months | 0.4 Cr. |
| 11 |
P. No. 6B, Trimix Concrete in Gothan Road, Hindu Cemetery
Road, Mahadev Temple Road, Gangaram Park, Shewale Hospital & other places. |
4 Months | 0.9 Cr. |
| 12 | P. No. 3A, To Trimix various roads. | 4 Months | 0.3 Cr. |
| 13 |
P. No. 8B, To do Cement Concrete for the remaining Road from
Sommeshwar Temple to Greenpark Hotel. |
4 Months | 0.7 Cr. |
| 14 |
Road condensation at Shanti Nagar, Azad Nagar, Kedari
Nagar, Vikas Nagar, Boradenagar. |
6 Months | 2.5 Cr. |
| 15 | Performing various development works at Hadapsar P. M. T Depot. | 3 Months | 3.28 Cr. |
| 16 | P. No. 29A Concrete road near the Maratha Temple at Bawdhan. | 6 Months | 0.5 Cr. |
| 17 | Performing various development works at Kothrud Depot. | 3 Months | 3.99 Cr. |
| 18 | Performing various improvement works at the Swargate PMT depot. | 3 Months | 1.3 Cr. |
| 19 | P. No. 8B, The remaining road from Park Avenue to Loan Road in Unit B Concrete Concrete. | 3 Months | 0.4 Cr. |
| 20 | P. No. 29A, Bavdhan K. To do Sports Club at Sr. No. 19/ 1+2 +3+4 & 22/11/2 A | 8 Months | 2.39 Cr. |
| 21 |
Shivajinagar Area P. No. 13 N. Tal. Preparation of Khasahaba
Jadhav School grounds of Wadi Pune 2 for various sports. |
4 Months | 1.2 Cr. |
| 22 |
Sr. No. 134, 135, 136, 138, 140 that connects Sus to Pashan.
36m MDP Roads Asphalting & Concreting Work that passes through Pashan. |
6 Months | 4.99 Cr. |
| 23 | Repair of road for service delivery under Nagar Road (Vadgaon Sheri) Regional Office. (Reinstatement) | ||
| 24 |
P. No. 17B, Yerwada National Games Route from Sale Tax Office
to Shastrinagar to Sahyadri Hospital UTWT Concrete Work. |
||
| 25 |
Performing annual maintenance repairs on concrete & asphalt
road through maintenance vans under Yerawada & Nagar Road zonal offices in Pune city. |
||
| 26 | P. No. 4B, To develop from L51 to M28 UTWT Road. | ||
| 27 | P. No. 4B, To develop from L53 to M34 UTWT Road. | ||
| 28 | P. No. 46 Reasphalting of Ramtekadi Industrial Road | ||
| 29 |
P. No. 9, Aundh, Baner, Balewadi, MNGL, MSEDCL Reinstatement &
specialist work on excavations carried through various companies. |
||
| 30 |
Building of Sheds for conveyor belt project & other projects
built for segregation at Bawdhan, Baner Balewadi. |
||
| 31 |
Design, Supply, Installation with foundation & Commissioning
of Zincalume Coated Steel pre-fabricated Ground Water Storage bolted Tanks including gravity / rising mains, Online chlornation & one Day Storage tank with taps & allied work for drinking water in water stressed villages in Pune, Satara, Ahmadnagar, Jalgaon, & N&ed Districts in Maharashtra. |
||
| 32 | Term Contract for Repairs to lanes & by lanes with ready mixed Concrete. |